B Bilgin Global Mod Global Mod 11 Eki 2022 #1 Suzlon Energy secures order of 144.9 MW from Aditya Birla Group The project is located in Gujarat and Madhya Pradesh and is expected to be commissioned in 2023
Suzlon Energy secures order of 144.9 MW from Aditya Birla Group The project is located in Gujarat and Madhya Pradesh and is expected to be commissioned in 2023