Bullet train project: Zetwerk bags order from L&T for fabricated girders

Bilgin

Global Mod
Global Mod
Bullet train project: Zetwerk bags order from L&T for fabricated girders The MAHSR bullet train project will connect Mumbai and Ahmedabad through 12 stations at the cost of ₹1.1 lakh crore. The train will cover 508 km in 2 hours and 7 mins with a maximum operational speed of 320 km/hour
 
Üst