B Bilgin Global Mod Global Mod 4 May 2024 #1 Adani's petrochemical plant inches closer to getting a ₹17,000-cr lifeline from SBI-led consortium The petrochemical project is expected to require an overall capex of ₹25,000-27,000 crore
Adani's petrochemical plant inches closer to getting a ₹17,000-cr lifeline from SBI-led consortium The petrochemical project is expected to require an overall capex of ₹25,000-27,000 crore